| Acronym Institute Home Page | Calendar | UN/CD | NPT/IAEA | UK | US | Space/BMD |
| CTBT | BWC | CWC | WMD Possessors | About Acronym | Links | Glossary |
ACRONYM Report No.9, April 1996
CHAIRMAN OF THE AD HOC COMMITTEE ON A NUCLEAR TEST BAN CD/NTB/WP.321 21 March 1996
Working Paper
Outline of a draft Comprehensive Nuclear Test-Ban Treaty
TABLE OF CONTENTS
A.VERIFICATIONDURATION AND WITHDRAWALPROTOCOL TO THE COMPREHENSIVE NUCLEAR TEST-BAN TREATY
ANNEX TO THE PROTOCOL
© 1996 The Acronym Institute.
| PREAMBLE | |
| ARTICLE I | BASIC OBLIGATIONS |
| ARTICLE II | THE ORGANISATION |
| A.GENERAL PROVISIONS | |
| B.THE CONFERENCE OF THE STATES PARTIES | |
| C.THE EXECUTIVE COUNCIL | |
| D.THE TECHNICAL SECRETARIAT | |
| E.PRIVILEGES AND IMMUNITIES | |
| ARTICLE III | NATIONAL IMPLEMENTATION MEASURES |
| ARTICLE IV | |
| B.GENERAL PROVISIONS | |
| C.THE INTERNATIONAL MONITORING SYSTEM | |
| D.CONSULTATION AND CLARIFICATION | |
| E.ON-SITE INSPECTIONS | |
| F.ASSOCIATED CONFIDENCE BUILDING/TRANSPARENCY MEASURES | |
| ARTICLE V | MEASURES TO REDRESS A SITUATION AND TO ENSURE COMPLIANCE, INCLUDING SANCTIONS |
| ARTICLE V1 | SETTLEMENT OF DISPUTES |
| ARTICLE VII | AMENDMENTS |
| ARTICLE VIII | REVIEW OF THE TREATY |
| ARTICLE IX | |
| ARTICLE X | STATUS OF THE PROTOCOL |
| ARTICLE XI | SIGNATURE |
| ARTICLE XII | RATIFICATION |
| ARTICLE XIII | ACCESSION |
| ARTICLE XIV | ENTRY INTO FORCE |
| ARTICLE XV | RESERVATIONS |
| ARTICLE XVI | DEPOSITARY |
| ARTICLE XVII | AUTHENTIC TEXTS |
| [PEACEFUL USE OF NUCLEAR ENERGY] | |
| [PEACEFUL NUCLEAR EXPLOSION] | |
| [SECURITY ASSURANCES FOR STATE PARTIES] | |
| [RELATION TO OTHER INTERNATIONAL AGREEMENTS] | |
| [ANNEX | LISTS OF STATES] |
| PART I: | THE INTERNATIONAL MONITORING SYSTEM |
| A.GENERAL PROVISIONS | |
| B.SEISMOLOGICAL MONITORING | |
| C.RADIONUCLIDE MONITORING | |
| D.HYDROACOUSTIC MONITORING | |
| E.INFRASOUND MONITORING | |
| F.INTERNATIONAL DATA CENTRE FUNCTIONS | |
| H.USE OF SATELLITE DATA AND OTHER METHODS | |
| PART II: | ON-SITE INSPECTIONS |
| A.GENERAL PROVISIONS | |
| B. STANDING ARRANGEMENTS | |
| C. PROCEDURES FOR REQUESTING AN INSPECTION | |
| D. PRE-INSPECTION ACTIVITIES | |
| E. CONDUCT OF INSPECTIONS | |
| PART III: | ASSOCIATED/CONFIDENCE-BUILDING |
| [IMS Part 5: | Satellite Monitoring] |
| [IMS Part 6: | Electromagnetic Pulse Monitoring] |
| Table 1-A | Seismological Stations Comprising the Primary Network |
| Table 1-B | Seismological Stations Comprising the Auxiliary Network |
| Table 2-A | Radionuclide Stations Incorporated into the International Monitoring System |
| [Table 2-B | Radionuclide Laboratories] |
| [Table 2-C | Flying Laboratories Incorporated into the International Monitoring System] |
| Table 3 | Hydroacoustic Stations Incorporated into the International Monitoring System |
| Table 4 | Infrasound Stations Incorporated into the International Monitoring System |
| [APPENDIX | Characterisation Parameters for International Data Centre Standard Event Screening] |